About Benefits News Permitting FAQ Contact First Wind

Permitting for Rollins Wind

The path to responsible development

Permitting to be submitted for Rollins Wind:


Ongoing studies at the Rollins Wind site:

First Wind is in the process of conducting a wide range of studies to ensure compliance with strict Maine DEP standards. The following studies will be conducted or are underway:

  • Detailed wind resource assessment
  • Aerial photography and topographic mapping
  • Botanical resources survey
  • Wildlife habitat assessment
  • Wildlife literature review, consultations, and field assessments
  • Endangered and threatened species assessment
  • Wetland delineation and assessment
  • Visual impact assessment
  • Photo simulation
  • Shadow Flicker assessment
  • Sound impact assessment
  • Groundwater impact assessment
  • Erosion and sedimentation control plan
  • Stormwater pollution prevention plan
  • Geotechnical studies
  • Broadcast and communications interference studies
  • FAA and military aviation safety and lighting planning